Achievements

SPECIAL ACHIEVEMENTS:

  1. Restoration of 2x 500 MW Boilers at NTPC, Farakka, W.B.
  2. Erection of 6 nos. GE Frame 9E Gas Turbine set including fabrication & erection of exhaust chimneys within schedule completion time of one year at RIL, Jamnagar.
  3. In situ Grinding of Turbine Rotor journals at Chandrapura TPS, DVC, Bihar.
  4. In situ Grinding of Generator Hydrogen seal collar at Santaldih TPS, West Bengal.
  5. Reblading of Turbine Rotor and Stator stages at site and in situ machining of the stages profiles at various sites.
  6. ETC of LTRH Coil Bank 2x 660 MW Boilers at NTPC,Barh.
  7. Replacement of PRH Top & intermediate Bank Coil of U#5 BTPS, W.B.